Our Work

Recent Projects & Case Studies

A selection of recent work from our Gold Coast City Marina base, refits, repairs and installations delivered to factory standard.

500 +
Projects delivered
40 +
Brands supplied, installed & serviced
15 +
Years' experience across the team
Generator Removal, Rebuild & Refit, 54m Superyacht Superyachts
Featured Project · May 2025

The port generator on a visiting 54m superyacht needed its prime mover and alternator removed for rebuild through a restricted engine room route. We used a scaffold transition beam and trolleys to remove both units and refitted them two and a half weeks later. The generator was then connected to the switchboard and running. We also worked through the engineer's list during six weeks aboard.

54m superyacht (M/Y), twin diesel generators 6 weeks at the berth On request
View Project
Marine Sanitation & Seacock Replacement, 11m Flybridge Cruiser Sanitation
Jun 2026

Marine Sanitation & Seacock Replacement, 11m Flybridge Cruiser

While investigating a blocked toilet system, we found a badly corroded seawater-intake seacock that posed a sinking risk. We rebuilt the black-water system and renewed every below-waterline fitting before relaunch.

5-day hardstand On request
Sanitation Vacuum-Pump Rebuild & Motor Replacement, Visiting Superyacht Superyachts
May 2026

Sanitation Vacuum-Pump Rebuild & Motor Replacement, Visiting Superyacht

A routine Evac vacuum-pump overhaul on a visiting superyacht revealed a failed electric motor beyond economic repair. With the vessel bound for the Pacific on a tight schedule, we rebuilt the pump end and sourced a replacement motor from Europe. We also ran a six-unit fluid-analysis program. It detected fuel dilution in a main engine before a breakdown occurred.

9-week program incl. global parts sourcing On request
Raw-Water System & Sea Strainer Overhaul, Superyacht Hardstand Refit Superyachts
Jun 2024

Raw-Water System & Sea Strainer Overhaul, Superyacht Hardstand Refit

This superyacht was hauled out at Gold Coast City Marina with heavily fouled intakes and bronze sea strainers seized solid. We removed old stainless pipework and refurbished the strainer housings with new lids in our workshop. We fabricated custom 316 studs and serviced the stern thruster. A new air-conditioning circulation pump was commissioned before relaunch, completing the raw-water overhaul.

2-week hardstand On request
Telescopic Tender Crane Overhaul & Dyneema Renewal, Motor Yacht Davits & Cranes
Feb 2026

Telescopic Tender Crane Overhaul & Dyneema Renewal, Motor Yacht

A telescopic tender-garage crane came out of service with a worn Dyneema lifting line and stripped mounting threads. We removed the crane and internal extension arm at the berth using a purpose-built lifting setup, without a shipyard crane. We renewed the line and repaired the threads. A water-bag load test was followed by a full tender lift before sign-off.

3 days at the berth On request
Stabiliser & Bow Thruster Overhaul, Motor Yacht Hardstand Refit Stabilisers & Thrusters
May 2026

Stabiliser & Bow Thruster Overhaul, Motor Yacht Hardstand Refit

A snapped swim platform strut led to an in-water repair. The haul-out that followed became a full overhaul of both stabiliser fin shafts, the bow thruster gearbox and the platform lifting gear. We renewed sleeve bearings, seals and spacer plates using custom tooling. The saltwater-contaminated thruster was rebuilt, and redesigned billet clevis arms were fitted to the platform. All systems were signed off on sea trial.

4-week hardstand On request
Main Engine Exhaust Overhaul & Valve Renewal, RINA-Classed Motor Yacht Superyachts
May 2026

Main Engine Exhaust Overhaul & Valve Renewal, RINA-Classed Motor Yacht

We stripped both main engine exhaust systems on a RINA-classed motor yacht to the hull flanges during an extended hardstand refit. We renewed DN350 and DN400 butterfly valves with European-sourced units carrying EN 10204-3.1 material certificates. High-temperature graphite gaskets and stud bolts were custom made, and we found burn-through marks on the starboard expansion joint. The rebuilt systems were pressure tested in line with class requirements.

10 weeks on the hardstand On request
Whole-Vessel Systems Survey & Hardstand Maintenance, Flybridge Motor Yacht Surveys & Maintenance
Feb 2026

Whole-Vessel Systems Survey & Hardstand Maintenance, Flybridge Motor Yacht

During a ten-day hardstand at The Boat Works, we completed a whole-vessel systems survey, inspecting and reporting on every valve, pump, thruster and hose as work progressed. We stripped and rebuilt seized sea strainers and serviced the watermaker. We renewed the fresh water system tap by tap. The vessel returned to the water on schedule.

10-day hardstand + return visit On request
Hydraulic Davit Crane Refurbishment & Load Test, Motor Yacht Davits & Cranes
Sep 2026

Hydraulic Davit Crane Refurbishment & Load Test, Motor Yacht

We removed a Besenzoni hydraulic davit crane from a motor yacht during its refit and dismantled it for full refurbishment. The five cylinders, slewing swivel and power unit were overhauled and pressure-tested, and the hoses were condition-reported and renewed. The structure was repainted, then rebuilt in our Coomera workshop. The crane was lifted aboard at The Boat Works and load-tested to its 600 kg plate rating before sign-off.

Workshop refurbishment, refitted Aug 2026 On request
Twin Muir Windlass Overhaul & Seized Shaft Recovery, Classic Sailing Yacht Anchoring & Deck Machinery
Sep 2026

Twin Muir Windlass Overhaul & Seized Shaft Recovery, Classic Sailing Yacht

Both Muir anchor windlasses came off a classic sailing yacht for overhaul, but heat, a hydraulic power pack and a jack could not free the seized starboard main shaft. A controlled chain-locker hatch allowed us to lower the whole assembly out and press it apart in the workshop. Both gearboxes received new Muir shafts, bearings and seals. The corroded housings were blasted, primed and painted before the windlasses were refitted, greased and tested on deck.

6 weeks at the berth, gearboxes rebuilt in Coomera On request
Shaft Seals, Cutlass Bearings & Engine Service, 14m Trawler-Style Motor Yacht Shafts & Propulsion
Oct 2026

Shaft Seals, Cutlass Bearings & Engine Service, 14m Trawler-Style Motor Yacht

We serviced the main engines and gearboxes on a trawler-style motor yacht during its haul-out for antifouling. After inspecting the running gear, we removed both propeller shafts and fitted two new PSS shaft seals and four new cutlass bearings. Bench testing during the service found failed seals and bearings in both raw water pumps. We replaced both pumps before relaunch.

3 weeks on the hardstand On request