Stabiliser & Bow Thruster Overhaul, Motor Yacht Hardstand Refit

A snapped swim platform strut led to an in-water repair. The haul-out that followed became a full overhaul of both stabiliser fin shafts, the bow thruster gearbox and the platform lifting gear. We renewed sleeve bearings, seals and spacer plates using custom tooling. The saltwater-contaminated thruster was rebuilt, and redesigned billet clevis arms were fitted to the platform. All systems were signed off on sea trial.

Motor yacht (M/Y) Shipyard hardstand, Coomera QLD Delivered May 2026
Stabiliser & Bow Thruster Overhaul, Motor Yacht Hardstand Refit
The job

Emergency Repair to Sea Trial

  1. 01

    Emergency Fault Diagnosis

    The swim platform was low at the starboard corner. Hydraulic testing showed a lifting strut had snapped at the thread.

  2. 02

    In-Water Support Replacement

    A replacement support fabricated in 316 stainless was fitted in the water, and the platform was levelled. The permanent repair was booked.

  3. 03

    Fin & Sleeve Bearing Removal

    We dismantled both leaking fin shafts with custom-machined tooling and chiselled out the sleeve bearings by hand.

  4. 04

    Spacer Plate & Bearing Renewal

    New spacer plates were laser-cut. A hydraulic pressing rig fitted the bearings, with housings heated and bearings chilled.

  5. 05

    Thruster & Platform Rebuild

    We stripped and rebuilt the salt-contaminated bow thruster gearbox and fitted redesigned billet stainless clevis arms to the platform.

  6. 06

    Sea Trial & Sign-Off

    We tested stabilisers under high load through S-bends. Pressures stayed steady, with no leaks. The platform was strong and level.

The Brief

The first call was for an emergency repair. The hydraulic swim platform of a motor yacht berthed at Coomera was low at the starboard corner. The captain needed to know whether the vessel could keep operating.

We re-torqued and bled the hydraulics, then confirmed that the circuit held stable pressure. This ruled out the power pack and indicated a mechanical fault. The starboard lifting strut had snapped at the thread. Its bottle-screw arrangement had been flagged as a weak point since the vessel was built.

We fabricated a replacement support in marine-grade 316 stainless and fitted it with the vessel in the water. We checked that the platform was level with a spirit line and handed it back operational. The permanent redesign was booked for the next haul-out.

The next haul-out became a four-week hardstand. The main job was overhauling both stabiliser fin shafts, which had been letting salt water past their seals.

We removed both fins using extraction tooling we machined for the job. One tool was cut from an impact socket to release the locking shafts. The composite sleeve bearings were too hard to collapse, so each was chiselled out by hand. We cleaned the housings back to bright metal.

New spacer plates were laser-cut. We refitted the sealing assemblies with lip seals, circlips and a marine sealant approved directly by the stabiliser manufacturer for saltwater service.

We built a hydraulic pressing rig on threaded rods to fit the new bearings. Heating the housings and chilling the bearings provided the clearance needed. The bearings had to remain intact throughout fitting.

The bow thruster gearbox oil drained thick, black and salty. We stripped the unit completely and renewed its tapered bearings, seals, gaskets and fasteners. The gearbox was flushed with clean oil.

We also completed the permanent swim platform repair. Testing the original clevis arm design showed deformation and cracking. We redesigned the arms in solid billet stainless with reinforced welds.

We refitted and zeroed the fins and refitted the thruster propellers. With the platform rebuilt, we ran the sea trial ourselves. We tested the stabilisers under high load through S-bend manoeuvres. Power pack pressures stayed steady, with no leaks on either port or starboard. The platform was strong and level.

Scope

Services Rendered

Stabiliser fin removal & refit
Fin shaft sleeve bearing & seal renewal
Custom extraction & pressing tooling
Laser-cut spacer plate fabrication
Bow thruster gearbox rebuild after saltwater ingress
Swim platform clevis arm redesign in billet 316
Emergency in-water strut fabrication
Hydraulic system testing & fault isolation
Sea trial commissioning
Gallery

From the Project

Aerial view of a motor boat carving a circular wake across clear blue water